{"id":8980,"date":"2026-03-17T10:56:52","date_gmt":"2026-03-17T09:56:52","guid":{"rendered":"https:\/\/stc-dev.com\/project-start-in-hohenems-new-building-for-hypo-bank\/"},"modified":"2026-03-23T10:39:44","modified_gmt":"2026-03-23T09:39:44","slug":"project-start-in-hohenems-new-building-for-hypo-bank","status":"publish","type":"post","link":"https:\/\/stc-dev.com\/en\/project-start-in-hohenems-new-building-for-hypo-bank\/","title":{"rendered":"Project start in Hohenems &#8211; new building for Hypo Bank"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1216.8px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-blend:overlay;--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:0px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p><b>STC takes over the tendering, awarding and local construction supervision<\/b><\/p>\n<\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-bottom:35px;width:100%;\"><div class=\"fusion-separator-border sep-single\" style=\"--awb-height:20px;--awb-amount:20px;border-color:var(--awb-color3);border-top-width:2px;\"><\/div><\/div><div class=\"fusion-text fusion-text-2\"><p>An architecturally and technically sophisticated new construction project for Hypo Vorarlberg is starting in Hohenems: an office and bank building with a basement, five floors above ground and a flat roof is being built at a neuralgic location. The design by architektur.terminal dieter klammer under the direction of Dieter Klammer impresses with a clear design language and a high-quality fa\u00e7ade design with a dark wood-aluminium mullion-transom construction, anodized aluminium frames and immovable oak slats as a distinctive design element. The bank branch extends over the ground and first floors, with flexible office space for external tenants above.  <\/p>\n<p>The project also has high technical requirements: Due to the geotechnical conditions, a deep foundation was laid using low-vibration in-situ concrete piles and the excavation pit was enclosed on all sides. The building is heated by a geothermal heat pump, supplemented by a mechanical ventilation system with heat recovery. An automatic fire alarm system with full protection ensures maximum safety.  <\/p>\n<p>STC Development GmbH, represented by our site manager Jerome Winsauer, is responsible for the tendering and awarding of contracts as well as the local construction supervision for this project. We would like to thank you for the trust you have placed in us and are delighted to be able to support another important project in Hohenems. Precise coordination, technical expertise and partnership-based cooperation are crucial, especially in sensitive urban development locations &#8211; and this is precisely where we bring our strengths to bear.  <\/p>\n<p>#STC #project start #\u00d6BA #Hohenems<\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":5,"featured_media":8977,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[111,112,115],"class_list":["post-8980","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-unkategorisiert","tag-vienna","tag-stc-development-en","tag-real-estate-development"],"_links":{"self":[{"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/posts\/8980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/comments?post=8980"}],"version-history":[{"count":2,"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/posts\/8980\/revisions"}],"predecessor-version":[{"id":8982,"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/posts\/8980\/revisions\/8982"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/media\/8977"}],"wp:attachment":[{"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/media?parent=8980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/categories?post=8980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stc-dev.com\/en\/wp-json\/wp\/v2\/tags?post=8980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}