Planning phase has begun, PIER05
New energy standards in building services planning

With the PIER05 project, we are setting an important course in sustainable project development – despite cross-industry challenges. Despite cross-sector challenges, we are continuing to set the course for the future and progress. Over the next few years, a sustainable building ensemble designed by Zechner & Zechner ZT GmbH, StudioVlaySteeruwitz ZT-GmbH and DnD Landschaftsplanung will be built on an area of around 4,100 m² in Seestadt Aspern. With a mixed use of around 75% residential space and 25% commercial space, our PIER05 offers modern living comfort and flexible commercial space. With its green roof surfaces, façade greening and innovative building services concept, PIER05 meets the highest standards of sustainability, energy efficiency and quality of stay.

The PIER05 project is currently in the design phase. One focus is on the development of a future-oriented building services concept that makes an important contribution to the future of energy and the City of Vienna’s climate protection goals.

A special feature of the well thought-out concept is the planned use of exhaust air heat to heat water. Energy is recovered from the already heated room air, which significantly reduces exhaust air losses. In traditional concepts, the air from the residential units (via fans in the bathroom and WC) is discharged outside unused, even though it has a high energy content.

In our concept, however, this energy-rich exhaust air is not discharged outside, but routed to the basement. There, a heat pump extracts the energy from the air and uses it to heat the hot water. This process has only been implemented in a few residential construction projects to date.

In combination with other sustainable technologies such as deep probes, groundwater utilization and large-scale photovoltaic systems on the facades, a high degree of self-sufficiency can be achieved. We at STC Development GmbH look forward to the further development of PIER05 and the innovative methods used to add a future-proof project to the Vienna skyline.

#STC #PIER05 #SeestadtAspern #ESG

Published On: 17. October 2024Tags: , , , , 333 words1.7 min read

Share this post on social media!